4900 Spa : A construction site affecting our network is ongoing or upcoming

About the construction site

Communes

Spa

Rues concernées
Avenue Reine Astrid
Rue Adolphe Bastin
Rue du Marché
Rue Rogier
Rue du Jeu de Paume
Place Pierre le Grand
Rue de l'Hôtel de Ville
Rue Promenade de Quatre Heures
Rue Royale
Rue Delhasse
Place Royale
Rue de la Gare
Fagne-Raquet
Rue Beaurieu
Rue Hanster
Rue du Fourneau
Place du Perron
Promenade des Français
Place du Monument
Rue Storheau
Rue Docteur Henri Schaltin
Rue Xhrouet
Boulevard des Anglais
Parc de 4 Heures
Rue Général Bertrand
Rue entre les Ponts
Biez du Moulin
Parc de 7 Heures
Rue Jean Gérardy
Impasse Hechelet
Rue Brixhe
Rue Dagly
Ruelle Hanse
Rue de la Poste
Type de travaux
A construction site affecting our network is ongoing or upcoming
À propos du chantier

Our teams are working on the drinking water distribution network to supply a new area.

This work may extend over several days and cause irregular water outages of varying duration. Pressure drops may also occur.

Aware of the inconvenience, our teams are doing everything possible to minimise the impact of these works, both:

  • on the supply of drinking water to your tap
  • on traffic around the work site.

If planned water outages are required, SWDE or the company in charge of the work will notify affected residents at least three days in advance.

 

During or after the work, you may notice several phenomena when opening the tap:

  • Temporary drops in pressure
    No need to worry — these phenomena are temporary. If they persist, please contact our customer service.
  • Brownish or reddish water
    See our recommendations.
  • Milky-looking water
    This phenomenon is not related to excess limescale. It results from air bubbles in the water and has no impact on water quality (see Water Quality FAQ).

 

In order to limit the impact of road or pavement openings for residents, other utilities sometimes take the opportunity to install their underground infrastructure (optical fibre, gas, sewerage, etc.). As a result, the duration of the works may vary according to each stakeholder’s constraints, over which SWDE has no control.

The end date of the works shown on this page may be postponed due to unforeseen difficulties encountered during the work or depending on weather conditions.

More information

FAQ

Disturbances caused

Risque de manque d'eau ponctuel (baisse de pression)
Oui
Risque de manque d'eau ponctuel déjà planifié
Oui
Date et heure de début/Date et heure de fin
Coordonnées geofield